Sendall China Electric Co.,Ltd. Company Logo Sendall China Electric Co.,Ltd.

FCM-II Compact Busbar System

Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price

Browse by Category

Contact us

Sendall China Electric Co.,Ltd.
[China]

Address
No 18,Anju Rd,Beilun Distric Ningbo Zhejiang
Phone
86-0574-86150258
Contact name
Irene

Quick Information

  • Brand Name: Sendall
  • Place of Origin: China
  • Model Number : FCM-II

Description

FCM-II Compact busbar system:

blob.png

Busbar types

blob.png

Product features

blob.png

blob.png

blob.png

blob.png

blob.png

blob.png

blob.png

blob.png

blob.png

Technical Data

blob.png

blob.png

System Configurations

blob.png
Power supply system design, not only to comply with industry standards and design specifications, but also to take into account the economic, security, and more able to meet the technical requirements. The choice of electrical equipment should be based on whether the whole system is to achieve the best configuration, and not limited to the characteristics of the various devices, such as power distribution cabinet and transformer selection, it should take into account the matching between the device, as a whole, rather than a single choice.
Component performance is stable, has a strong adaptability, not only for the rated working environment, but also in the relatively harsh environment can also be used. As a new power transmission system, the following points should be fully considered:
◆The building of the type, use and form (for example: high-rise buildings, cottage and workshop etc.).
◆The transformer and power distribution cabinet position.
◆The construction management department regulations and guidelines.
◆The guidelines for the power supply department.
Under normal circumstances, will be as many as possible to make several design, through the technical and commercial considerations, the choice of the most suitable for the user needs, the most economical savings for the user to confirm the final. In the budget plan, will give priority to the following points:
◆The design is simple and clear
◆The long service life
◆The practical
◆The fire performance
◆The building changes, re assemble equipment can use again
The above problems in engineering projects will often encounter, bus slot system due to its own characteristics can fully meet the above requirements, so in practical application, bus channel system has gradually replaced the cable, and become the first choice for engineering personnel transmission and distribution products.


Packaging & Delivery

  • Packing :normal or customized
  • Delivery Lead Time : 30days for OEM,7days for ready goods
  • Minimum Order : 10,000meters
  • Supply Ability : 100,000

Product Image

  • FCM-II Compact Busbar System image

Related products from premium suppliers on EC21

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To Irene
Sendall China Electric Co.,Ltd.
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Power Distribution Equipment
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
Chat Online with$Sendall China Electric Co.,Ltd..
Click the "S Chat" Icon on the right-hand to contact Sendall China Electric Co.,Ltd..
Note: Please ensure you have installed Skype program in your computer.
           If you don't have yet, click here to download Skype.

Close Window